Canberra Light Rail Seeks CCTV For Stage 2 – City to Commonwealth Park.
Canberra Light Rail Seeks CCTV – Canberra Light Rail is seeking integration of operations-related systems ticketing, information displays, Wi-Fi and CCTV for Stage 2 – City to Commonwealth Park.
The Canberra Light Rail Stage 2A (LRS2A) Project is an extension of the existing light rail system (LRS1) between Gungahlin and the City.
Powered renewable energy, the LRS2A Project comprises 1.7km of wire-free light rail from the existing terminus in Alinga Street through to a new terminus stop at Commonwealth Park and includes the construction of 2 intermediate stops at Edinburgh Avenue and City South.
LRS2A will be integrated seamlessly with LRS1 with the light rail vehicles travelling the full length of the combined LRS1-LRS2A line. As part of the project, a new bridge will be built over Parkes Way, and a new traction power substation (TPS 6) will be built adjacent to the Swinden Street Stop.
The project includes electrical adjustments and communication adjustments, along with integration of operations-related systems (ticketing, information displays, Wi-Fi and CCTV.
Construction will be from early 2025 to 2027, with testing and commissioning from late 2026 to 2027, while operations will commence early 2028.
This Canberra Light Rail Seeks CCTV tender closes on 31 December – You can learn more about work packages here – there’s more SEN news here.
“Canberra Light Rail Seeks CCTV For Stage 2 – City to Commonwealth Park.”